Peningkatan Produktivitas Pada Proses Produksi Pracetak Dengan Penerapan Metode Lean Construction Untuk Eliminasi Waste
Autor: | Yunita Dwi Setyastuti, Sri Murni Dewi, Agus Suharyanto |
---|---|
Rok vydání: | 2017 |
Předmět: |
Lean construction
Computer science Unification process Unification Process Value Stream Mapping General Medicine Root cause Engineering (General). Civil engineering (General) Lead Time Manufacturing engineering Lean Construction Value stream mapping Product (business) Critical Waste Precast concrete Value Stream Analysis Tools TA1-2040 Productivity Lead time |
Zdroj: | Rekayasa Sipil, Vol 11, Iss 3, Pp 186-193 (2018) |
ISSN: | 2502-6348 1978-5658 |
DOI: | 10.21776/ub.rekayasasipil/2017.011.03.3 |
Popis: | PT. X is one of the largest precast concrete industry in Indonesia, where to realize the vision, they continue to develop products and improve productivity performance by trying to improve quality of service, production process, and delivery product to customer with minimal cost and on time. To reach that purpose, needed Lean Construction method to eliminate waste and identify activities that can affect the products value-added.Research begins with description of the company's condition using Value Stream Mapping. Waste was identified by questionnaires, then analyzed by selection of mapping tools on Value Stream Analysis Tools and analyzed the root cause for suggestion of improvement. The results showed that the most critical waste that affectted productivity were defects (37.50%), unnecessary inventory (25%), and inappropiate processing (15%). Lead time required for overall of the process was 479.56 minutes and after improvement was reduced to 463.83 minutes by unification T.III / T.IV (fixing and tightening of the bolt plate) which reduced non-value added 15.73 minutes. |
Databáze: | OpenAIRE |
Externí odkaz: |