The analysis of personal and delay allowances using work sampling technique in the sewing room of a clothing manufacturer
Autor: | Sinem Gunesoglu, Binnaz Meric |
---|---|
Přispěvatelé: | Uludağ Üniversitesi/Mühendislik Fakültesi/Tekstil Mühendisliği Bölümü., Güneşoğlu, Sinem, Meriç, Binnaz |
Rok vydání: | 2007 |
Předmět: |
Optimization
Engineering Needle-Punched Nonwoven Clothing Industry Production Technique Polymers and Plastics Operations research Materials Science (miscellaneous) Sewing Garment manufacture Working conditions Work-flows Garment industry Garment industries Measurement study Optimization techniques Operations management Sampling Work sampling General information business.industry Design/methodology/approach Working time Clothing General Business Management and Accounting Materials science Work (electrical) Clothing industry Business Management and Accounting (miscellaneous) Work flow Materials science textiles business |
Zdroj: | International Journal of Clothing Science and Technology. 19:145-150 |
ISSN: | 0955-6222 |
DOI: | 10.1108/09556220710725739 |
Popis: | PurposeThe aim of this paper is to study the operator activities in garment industry and the percentages of distribution of operations and to analyze the personal and delay allowances by observing the operations and deriving the ratios within a manufacturing period.Design/methodology/approachA work sampling technique is used. Relevant reports (1978‐2004) are studied to give the basis and methodology of the technique. In accordiance with work sampling techique, the operations to be observed in a sewing room are defined, the number of observations and observers required for each day and the procedure for making observations are determined and the distributions of work flows are calculated.FindingsIt is found that 72.7 per cent of working time in an general sewing room was spent for productive activities and 23.2 per cent for personal and unavoidable delay allowances.Practical implicationsWork sampling technique gives information about personal and delay allowances in a work flow of any sewing room. When the distributions of activites are determined, it is possible to find which activities are most responsible for low efficiency. For this purpose, standard operations time in a sewing room should be determined by time measurement studies and work flow should be organized.Originality/valueThis paper deals with an actual sewing room and gives general information about the distributions of activites in work flow which should be used for organization of any sewing room. |