High intensity operation using proton stacking in the Fermilab Recycler to deliver 700 kW of 120 GeV proton beam

Autor: D. Capista, Meiqin Xiao, Kyle Hazelwood, I. Kourbanis, Philip Adamson, Ming-Jen Yang, Denton K. Morris, Bruce C. Brown, Robert Ainsworth
Jazyk: angličtina
Rok vydání: 2020
Předmět:
Zdroj: Physical Review Accelerators and Beams, Vol 23, Iss 12, p 121002 (2020)
ISSN: 2469-9888
Popis: As part of the NOvA upgrades in 2012, the Recycler was repurposed as a proton stacker for the Main Injector with the aim to deliver 700 kW. Since January 2017, this design power has been run routinely. The steps taken to commission the Recycler and run at 700 kW operationally will be discussed. Major improvements include a new collimation system to control transverse losses and diode damper system to damp the resistive wall instability during slip-stacking. Plans for future running will also be discussed.