Software Project Management Systems Using Kanban Method in the CV. Primavisi Globalindo
Autor: | Widhy Hayuhardhika Nugraha Putra, Muhammad Aliyya Ilmi, Fajar Pradana |
---|---|
Rok vydání: | 2020 |
Předmět: |
0209 industrial biotechnology
lcsh:T58.5-58.64 lcsh:Information technology Computer science ComputerApplications_COMPUTERSINOTHERSYSTEMS 02 engineering and technology lcsh:QA75.5-76.95 Manufacturing engineering project management codeigniter 020901 industrial engineering & automation Kanban (development) website application 0202 electrical engineering electronic engineering information engineering kanban 020201 artificial intelligence & image processing lcsh:Electronic computers. Computer science waterfall Software project management |
Zdroj: | Intensif: Jurnal Ilmiah Penelitian Teknologi dan Penerapan Sistem Informasi, Vol 4, Iss 2, Pp 215-231 (2020) INTENSIF: Jurnal Ilmiah Penelitian dan Penerapan Teknologi Sistem Informasi; Vol. 4 No. 2 (2020): August 2020; 215-231 INTENSIF: Jurnal Ilmiah Penelitian dan Penerapan Teknologi Sistem Informasi; Vol 4 No 2 (2020): August 2020; 215-231 |
ISSN: | 2549-6824 2580-409X |
Popis: | Reducing the risk of failure in working on software projects is one of the successes for the company. It can be done by implementing project planning management properly. One important aspect of project management planning is scheduling. Scheduling includes recording human resources and tasks in the project. The Kanban method is one of the methods used to overcome problems in controlling project schedules. This study aims to develop a project scheduling system that applies the Kanban method. In this research, project management and scheduling system will be developed using the Kanban method. This system expected to be able to assist companies in handling projects. Kanban was chosen because it can easily respond to project changes, easily implemented, and company needs. In this study, unit testing was performed on the system's three main features and tested the validity of the system's 49 functional requirements. The usability test produces a value of 76. Based on the validation and usability test results, it can be concluded that the system is included in the acceptable category. |
Databáze: | OpenAIRE |
Externí odkaz: |