World'S First Successful Dual String Installation of A Digital Intelligent Artificial Lift DIAL – Interventionless Gas Lift Production Optimization System, Offshore Malaysia

Autor: M Haziq M Ghazali, M Rizwan Rozlan, M Farris Bakar, M Faizatulizuddin Ishak, Orient Balbir Samuel, Mohd Al Perdaus Misron, Mohamad Sazwan Ismail, Nurfarah Izwana Salleh, Badroel Rizwan, Abdel Ben Amara, Stephen Faux, Ahmad Hafiz Ahmad Azhari, Azis Anak Muara
Rok vydání: 2022
Zdroj: Day 2 Wed, March 23, 2022.
Popis: PETRONAS completed well H-X on B field in Malaysia with a Digital Intelligent Artificial Lift (DIAL) gas lift production optimization system. This DIAL installation represents the first ever successful installation of the technology in an Offshore well for Dual String production. This paper provides complete details of the installation planning and operational process undertaken to achieve this milestone. DIAL is a unique technology that enhances the efficiency of gas lift production via downhole monitoring of production parameters informs remote surface-controlled adjustment of gas lift valves. This enables automation of production optimization removing the need for well intervention. This paper focusses on a well completed in November 2020, the fourth well to be installed with the DIAL technology across PETRONAS Assets. The authors will provide details of the well and the installation phases: system design, pre-job preparations, improvements implementation, run in hole and surface hook-up. For each phase, challenges encountered, and lessons learned will be listed together with observed benefits. The DIAL system introduces a paradigm shift in design, installation and operation of gas lifted wells. This paper will briefly highlight the justifications of this digital technology in comparison with conventional gas lift techniques. It will consider the value added from the design stage, through installation operations, to production optimization. This successful installation confirms the ability to implement the DIAL technology in a challenging dual string completion design to enable deeper injection while avoiding interventions on a well with a greater than 60-degree deviation. With remotely operated, non-pressure dependent multi-valve in-well gas lift units, the technology removes the challenges normally associated with gas-injected production operation in a dual completion well – gas robbing and multi-pointing. Despite the additional operational & planning complications due to COVID-19 restrictions, the well was completed with zero NPT and LTI. Once brought online, this DIAL-assisted production well will be remotely monitored and controlled ensuring continuous production optimization, part of PETRONAS' upstream digitization strategic vision.
Databáze: OpenAIRE