Optimal generation scheduling of interconnected wind‐coal intensive power systems
Autor: | Wei Zhang, Songyan Wang, Daren Yu, Jilai Yu, Kang Li, Aoife Foley |
---|---|
Rok vydání: | 2016 |
Předmět: |
Engineering
Wind power generation Wind power wind power interconnections generation scheduling coal cycling wind-coal intensive system business.industry 020209 energy Economic dispatch Scheduling (production processes) Energy Engineering and Power Technology 02 engineering and technology Reliability engineering Power (physics) Electric power system Control and Systems Engineering 0202 electrical engineering electronic engineering information engineering Coal Electrical and Electronic Engineering business Tie line Simulation |
Zdroj: | Wang, S, Yu, D, Yu, J, Zhang, W, Foley, A & Li, K 2016, ' Optimal generation scheduling of interconnected wind-coal intensive power systems ', IET Generation, Transmission and Distribution, vol. 10, no. 13, pp. 3276-3287 . https://doi.org/10.1049/iet-gtd.2016.0086 |
ISSN: | 1751-8695 |
DOI: | 10.1049/iet-gtd.2016.0086 |
Popis: | Large scale wind power generation complicated with restrictions on the tie line plans may lead to significant wind power curtailment and deep cycling of coal units during the valley load periods. This study proposes a dispatch strategy for interconnected wind-coal intensive power systems (WCISs). Wind power curtailment and cycling of coal units are included in the economic dispatch analysis of regional systems. Based on the day-ahead dispatch results, a tie line power plan adjustment strategy is implemented in the event of wind power curtailment or deep cycling occurring in the economic dispatch model, with the objective of reducing such effects. The dispatch strategy is designed based on the distinctive operation characteristics of interconnected WCISs, and dispatch results for regional systems in China show that the proposed strategy is feasible and can improve the overall system operation performance. |
Databáze: | OpenAIRE |
Externí odkaz: |