Qualification of rapid prototyping tools: proposition of a procedure and a test part

Autor: Robert Duchamp, Dominique Scaravetti, Patrice Dubois
Přispěvatelé: Institut de Mécanique et d'Ingénierie de Bordeaux (I2M), École Nationale Supérieure d'Arts et Métiers (ENSAM), Arts et Métiers Sciences et Technologies, HESAM Université (HESAM)-HESAM Université (HESAM)-Arts et Métiers Sciences et Technologies, HESAM Université (HESAM)-HESAM Université (HESAM)-Institut Polytechnique de Bordeaux-Institut National de la Recherche Agronomique (INRA)-Centre National de la Recherche Scientifique (CNRS)-Université de Bordeaux (UB), Laboratoire Conception de Produits et Innovation (LCPI), HESAM Université (HESAM)-HESAM Université (HESAM), Institut National de la Recherche Agronomique (INRA)-Université de Bordeaux (UB)-École Nationale Supérieure d'Arts et Métiers (ENSAM), HESAM Université (HESAM)-HESAM Université (HESAM)-Institut Polytechnique de Bordeaux-Centre National de la Recherche Scientifique (CNRS)
Jazyk: angličtina
Rok vydání: 2008
Předmět:
Zdroj: International Journal of Advanced Manufacturing Technology
International Journal of Advanced Manufacturing Technology, Springer Verlag, 2008, 38 (7-8), pp.683-690. ⟨10.1007/s00170-007-1129-2⟩
ISSN: 0268-3768
1433-3015
DOI: 10.1007/s00170-007-1129-2⟩
Popis: International audience; Rapid prototyping machines are becoming faster at manufacturing machine tools. The processes of quality assurance impose the qualification of the production devices. A procedure and a test part are proposed for that purpose; intended for the family of processes of point-by-point layer manufacturing. Existing test parts only permit benchmarking and comparisons between machines: their capacity can be evaluated, but the test part analysis does not make it possible to establish the link between noted defects and their causes. The proposed process and test part permit the identification of the defects and whether their origins are machine or material linked. This paper describes the approach used to design the test part. Some preliminary measures were made on a test part, in order to discuss procedure and measurements.
Databáze: OpenAIRE