Status of the RAL Front End Test Stand
Autor: | Letchford, Alan, Alsari, Saad, Ariz, Iratxe, Back, John, Bermejo, F. Javier, Clarke-Gayther, Michael, Eguiraun, Mikel, Enparantza, Rafael, Etxebarria, Victor, Faircloth, Dan, Gabor, Christoph, Garmendia, Nagore, Hassanzadegan, Hooman, Jolly, Simon, Kurup, Ajit, Lawrie, Scott, Lee, David, Perkins, Michael, Plostinar, Ciprian, Pozimski, Jürgen, Romano, Pierpaolo, Savage, Peter, Sedano, Angel, Wise, Philip |
---|---|
Jazyk: | angličtina |
Rok vydání: | 2010 |
Předmět: | |
Zdroj: | Scopus-Elsevier |
DOI: | 10.18429/jacow-ipac2010-mopec075 |
Popis: | The Front End Test Stand (FETS) under construction at the Rutherford Appleton Laboratory is the UK’s contribution to research into the next generation of High Power Proton Accelerators (HPPAs). HPPAs are an essential part of any future Spallation Neutron Source, Neutrino Factory, Muon Collider, Accelerator Driven Sub-critical System, Waste Transmuter etc. FETS will demonstrate a high quality, high intensity, chopped H-minus beam and is a collaboration between RAL, Imperial College and the Universtity of Warwick in the UK and the Universidad del Pais Vasco in Spain. This paper describes the current status and future plans of FETS. Proceedings of the 1st International Particle Accelerator Conference, IPAC2010, Kyoto, Japan |
Databáze: | OpenAIRE |
Externí odkaz: |