ТАЙШИРЫН УСАН ЦАХИЛГААН СТАНЦТАЙ ХОСЛОН АЖИЛЛАХ НАРНЫ ЦАХИЛГААН СТАНЦЫН СУДАЛГАА
Rok vydání: | 2016 |
---|---|
Předmět: |
Цахилгаан станц
нарны цацраг агаарын масс тунгалагшилт цахилгаан эрчим хүч Engineering business.industry Photovoltaic system Civil engineering lcsh:Social Sciences lcsh:H Work (electrical) Hybrid system General Earth and Planetary Sciences lcsh:Q lcsh:Science business Hydropower General Environmental Science |
Zdroj: | Proceedings of the Mongolian Academy of Sciences, Vol 54, Iss 2, Pp 5-9 (2016) |
ISSN: | 2312-2994 2310-4716 |
DOI: | 10.5564/pmas.v54i2.648 |
Popis: | This paper presents study and results of 10 MW Solar PV plant that will be work with Taishir hydropower plant (as a hybrid system) in Mongolian West region. |
Databáze: | OpenAIRE |
Externí odkaz: |