SPS Beam Dump System (SBDS) Commissioning After Relocation and Upgrade
Autor: | Van Trappen, Pieter, Carlier, Etienne, Ducimetière, Laurent, Namora, Vasco, Senaj, Viliam, Velotti, Francesco, Voumard, Nicolas |
---|---|
Jazyk: | angličtina |
Rok vydání: | 2022 |
Předmět: | |
DOI: | 10.18429/jacow-ipac2022-thpost039 |
Popis: | In order to overcome several machine limitations, the SBDS has been relocated from LSS1 (Long Straight Section 1) to LSS5 during LS2 (Long Shutdown 2) with an important upgrade of the extraction kicker installation. An additional vertical deflection kicker magnet (MKDV) was produced and installed while the high voltage (HV) pulse generators have been upgraded by changing gas-discharge switches (thyratrons and ignitrons) to semiconductor stacks operating in oil. Furthermore the horizontal sweep generators have been upgraded to allow for a lower kick strengths. The controls, previously consolidated during LS1, went through an additional light consolidation phase with among others the upgrade of the trigger retrigger distribution system and the installation of a new fast-interlocks detection system. This paper describes the commissioning without and with beam and elaborates on the measured improvements and encountered problems with corrective mitigations. Proceedings of the 13th International Particle Accelerator Conference, IPAC2022, Bangkok, Thailand |
Databáze: | OpenAIRE |
Externí odkaz: |