Dry cellar. The case of Bodegas Internacionales S.A. de Jerez
Autor: | Cristobal Miró-Miró, Esther Mayoral-Campa, Melina Pozo-Bernal |
---|---|
Přispěvatelé: | Universidad de Sevilla. Departamento de Expresión Gráfica Arquitectónica, Universidad de Sevilla. Departamento de Proyectos Arquitectónicos, Universidad de Sevilla. HUM789: Nuevas Situaciones, Otras Arquitecturas |
Jazyk: | angličtina |
Rok vydání: | 2021 |
Předmět: |
Engineering
Environmental Engineering 0211 other engineering and technologies Context (language use) 02 engineering and technology 010501 environmental sciences 01 natural sciences NA1-9428 lcsh:TH1-9745 First class Bodega 021105 building & construction Architecture Prefabricación Continuous evolution lcsh:NA1-9428 0105 earth and related environmental sciences Civil and Structural Engineering Building construction business.industry Contemporary heritage Building and Construction bodega Winery patrimonio contemporáneo Contemporary Heritage Prefabrication Economy Joint (building) lcsh:Architecture prefabricación arquinde Patrimonio contemporáneo business Arquinde TH1-9745 lcsh:Building construction |
Zdroj: | Informes de la Construccion, Vol 73, Iss 561, Pp e384-e384 (2021) Informes de la Construcción; Vol. 73 No. 561 (2021); e384 Informes de la Construcción; Vol. 73 Núm. 561 (2021); e384 Informes de la Construccion, Vol 73, Iss 561 (2021) |
ISSN: | 1988-3234 0020-0883 |
DOI: | 10.3989/ic.2021.v73.i561 |
Popis: | The region of Jerez has been a research territory not only referring to wine production systems, but also relating to an architectural investigation about the wineries. The continuous evolution of the wine sector has led to a transformation, over the last two centuries, of the types of wineries, in terms of their construction systems and spatiality. In this context, the International Wineries were built in 1974, designed by the Arquinde Technical Office, a building that represented an unprecedented constructive and structural challenge in the sector: the construction with a dry joint and in two years of a 50 000 m2 winery. The prefabricated concrete construction system used, the spatial and structural research proposed, closer to the Mat Building, than to the traditional “bodega catedral” sherry, made this unknown building an example of first class technological innovation. La comarca de Jerez ha sido un territorio de experimentación tanto en lo referente a los sistemas de producción de vino como en la investigación arquitectónica de los espacios que los cobijan: las bodegas. La continua evolución del sector vinícola ha llevado parejo una transformación, a lo largo de los últimos dos siglos, de los tipos bodegueros, en cuanto a sus sistemas constructivos y espacialidad. En este contexto, se construyen en 1974 las Bodegas Internacionales, diseñadas por la Oficina Técnica Arquinde, un edificio que supuso un desafío constructivo y estructural sin precedentes en el sector: la construcción con junta seca y en dos años de una bodega de 50 000 m2. El sistema constructivo de prefabricados de hormigón utilizado, la investigación espacial y estructural que propone, más cercano a estructuras contemporáneas extensivas que a la tradicional “bodega catedral” jerezana, hicieron de este desconocido edificio un ejemplo de innovación tecnológica de primer nivel. |