Life Cycle Assessment Of Expressway Passenger Transport Service: A Case Study Of Thailand

Autor: Watchara Surawong, Cheema Soralumn
Jazyk: angličtina
Rok vydání: 2014
Předmět:
DOI: 10.5281/zenodo.1097486
Popis: This research work is concerned with the life cycle assessment (LCA) of an expressway, as well as its infrastructure, in Thailand. The life cycle of an expressway encompasses the raw material acquisition phase, the construction phase, the use or service phase, the rehabilitation phase, and finally the demolition and disposal phase. The LCA in this research was carried out using CML baseline 2000 and in accordance with the ISO 14040 standard. A functional unit refers to transportation of one person over one kilometer of a 3-lane expressway with a 50-year lifetime. This research has revealed that the construction phase produced the largest proportion of the environmental impact (81.46%), followed by the service, rehabilitation, demolition and disposal phases and transportation at 11.97%, 3.72% 0.33% and 2.52%, respectively. For the expressway under study, the total carbon footprint over its lifetime is equivalent to 245,639 tons CO2-eq per 1 kilometer functional unit, with the phases of construction, service, rehabilitation, demolition and disposal and transportation contributing 153,690; 73,773; 3693, 755 and 13,728 tons CO2-eq, respectively. The findings could be adopted as a benchmark against which the environmental impacts of future similar projects can be measured.
{"references":["K. Junkeaw, Advanced Environmental Impact Assessment. Bangkok:\nKasetsart University, 2011.","C. J. Kibert, et al., Construction ecology Nature as the basis for green\nbuildings. London: Spon press, 2002.","SETEC, \"Guidelines for Life-Cycle Assessment: A \"Code of Practice,\"\nworkshop proceedings,\" ed. Florida Society of Environmental\nToxicology and Chemistry: Pensacola, 1993.","A. Azapagic and R. Clift, \"Life cycle assessment and multiobjective\noptimization,\" Jounal of Cleaner Production, vol. 7, pp. 137-143, 1999.","G. Rebitzera, et al., \"Life cycle assessment Part 1: Framework, goal and\nscope definition, inventory analysis, and applications,\" Environment\nInternational, vol. 30, 2004.","ISO, Environmental management-Life cycle assessment-Goal and scope\ndefinition and inventory analysis. ed. Geneva: International Organization\nfor Standardization, 1998.","X. Li, et al., \"An LCA-based environmental impact assessment model\nfor construction processes,\" Building and Environment, vol. 45, pp. 766-\n775, 2010.","W. Pintapun, \"Comparision of Concrete pavement and asphalt concrete\npavement for highway design in Thailand,\" Master of Engineering,\nMajor field Civil Engineering, Department of Civil Engineering,\nKasetsart Bangkok, Thailand, 2002.","S. Panwai, et al., \"Development of SIDRA-TRIP Integrated GPS Model\nto Evaluate Fuel Consumption/Emission on Expressway and Alternative\nRoad,\" ed. Busan: 17th ITS World Congress, Busan, 2010: Proceedings\n2010.\n[10] R. Chowdhury, et al., \"A life cycle base environmental impacts\nassessment of construction materials use in road construction,\" Resource\nconservation & Recycling, vol. 54, pp. 250-255, 2010.\n[11] Clifford J. Schexnayder and Richard E. Mayo, Construction\nManagement Fundamentals: McGraw Hill, 2004.\n[12] N.D. Lea International LTD, \"Modeling road deterioration and\nmaintenance effects in HDM-IV. Final Report,\" Vancouve Canada1992.\n[13] National Research Council, \"Modeling Mobile-Source Emission,\" 2000.\n[14] AEC, \"Final report on feasibility study environment impact assessment\nand route alignment study of Ekamai-Ramindra Expressway project,\"\nAsian Engineering Consultant, Bangkok Thailand1988.\n[15] R. Akcelik, et al., \"Calibrating Fuel Consumption and Emission Model\nfor Modern Vehicles,\" Paper presented at the IPENZ Transportation\nGroup Conference, Rotorua, New Zealand., 2012.\n[16] ETH-ESU 96, \"Öko-inventare von Energiesystemen,\" ESUGroup Ökoinventare\nvon Energiesystemen1996.\n[17] LCA.Lab National Metal and Materials Technology Center, \"Thai\nNational Life cycle Inventory Database,\" National Science and\nTechnology Development Agency, Ed., ed. Thailand, 2005.\n[18] D. P. Bowyer, et al., \"Guide to Fuel Construction Analysis for Urban\nTrafic Management,\" ARRB Transport Rearch Ltd, Vermont South,\nAustralia.1985.\n[19] Asain Development Bank, \"Reducing Carbon Emission from Transport\nProject,\" Asain Development Bank2010.\n[20] The world bank, \"Greenhouse Gas Emission Mitigation in Road\nConstruction and Rshabilitation,\" The world bank,2010.\n[21] S. Panwai, et al., \"Comparative Evaluation of Power-Based\nEnvironmental Emissions Models,\" IEEE (ITSC2006), vol. 9, pp. 1251-\n1256, 2006.\n[22] K. a. D. Aravind, A., \"Pavement design with central plant hot-mix\nrecycled asphalt mixes,\" Construction and Building Materials, vol. 21,\npp. 928-936 2007.\n[23] Y. Huang, et al., \"Measuring the carbon footprint of road construction\nusing CHANGER,\" International Journal of Pavement Engineering, vol.\niFirst, pp. 1-10, 2012.\n[24] S. R. Sanders, et al., \"Preliminary Estimating Models for Infrastructure\nProjects,\" Journal of Cost Engineering, vol. 34, pp. 7-13, 1992.\n[25] M. T. Callahan, et al., Construction Project Scheduling. New York:\nMcGraw-Hill, 1992."]}
Databáze: OpenAIRE