Chamber Gas Lift in Horizontals

Autor: S. L. Wildman, C. N. Hardegree, B. A. Gerrard, K. S. McKenzie
Rok vydání: 2018
Předmět:
Zdroj: Day 1 Tue, August 28, 2018.
DOI: 10.2118/190923-ms
Popis: Summary In this paper we highlight a pilot project in which chamber gas lift was installed in two unconventional horizontal wells. Chamber gas lift, a combination of deep gas lift and intermittent gas lift, allows for an efficient, closed completion with the cyclic injection of high-pressure gas, which expands and rapidly displaces fluid at high velocity from deep in the well. Development of the system was a collaboration internally and in conjunction with the vendor to install what was historically a vertical-well assembly through the curve section and into a horizontal wellbore. The chamber assembly was successfully designed, sourced, manufactured, installed, and operated. To modify the design from vertical to horizontal applications, components were custom-designed to maintain a sealed chamber. Components deemed most likely to fail are replaceable by slickline intervention. Results indicate a sustained lower downhole pressure than the previous intermittent-gas-lift system, an increase in production, and a good chamber-sweep efficiency.
Databáze: OpenAIRE