Autor: |
Xinjiang Huang, Chenggang Liu, Yuyang Miao |
Rok vydání: |
2018 |
Předmět: |
|
Zdroj: |
MATEC Web of Conferences, Vol 175, p 04028 (2018) |
ISSN: |
2261-236X |
DOI: |
10.1051/matecconf/201817504028 |
Popis: |
The recommissioning is performed for a research and development (R&D) center located in Suzhou. The hardware problems of Heating, Ventilation and Air Conditioning (HVAC) system and software problems of Electrical Monitoring and Control System (EMCS) were found. The recommissioning measures were generated and control logic in EMCS was optimized and improved. The saving of about 121kW for chilled water consumption, 181kW for hot water consumption and 1450 kWh/D for electricity consumption from recommissioning were achieved from recommissioning measures. |
Databáze: |
OpenAIRE |
Externí odkaz: |
|