Numerical Simulation and Risk Assessment of Cascade Reservoir Dam-Break
Autor: | Xu Yang, Shuyu Li, Liangming Hu, Qian Li |
---|---|
Rok vydání: | 2020 |
Předmět: |
lcsh:Hydraulic engineering
010504 meteorology & atmospheric sciences sequential breach risk analysis Geography Planning and Development 0207 environmental engineering 02 engineering and technology Aquatic Science 01 natural sciences Biochemistry lcsh:Water supply for domestic and industrial purposes lcsh:TC1-978 cascade reservoir 020701 environmental engineering Hydropower 0105 earth and related environmental sciences Water Science and Technology lcsh:TD201-500 geography geography.geographical_feature_category Flood myth Computer simulation Petroleum engineering business.industry humanities embankment dam Flood control Water resources Cascade numerical simulation Environmental science Embankment dam Levee business |
Zdroj: | Water, Vol 12, Iss 1730, p 1730 (2020) Water Volume 12 Issue 6 |
ISSN: | 2073-4441 |
DOI: | 10.3390/w12061730 |
Popis: | Despite the fact that cascade reservoirs are built in a large number of river basins nowadays, there is still an absence of studies on sequential embankment dam-break in cascade reservoirs. Therefore, numerical simulations and risk analyses of cascade reservoir dam-break are of practical engineering significance. In this study, by means of contacting the hydraulic features of upstream and downstream reservoirs with flood routing simulation (FRS) and flood-regulating calculation (FRC), a numerical model for the whole process of cascade reservoir breaching simulation (CRBS) is established based on a single-embankment dam-break model (Dam Breach Analysis&mdash China Institute of Water Resources and Hydropower Research (DB-IWHR)). In a case study of a fundamental cascade reservoir system, in the upstream Tangjiashan barrier lake and the downstream reservoir Ⅱ, the whole process of cascade reservoir dam-break is simulated and predicted under working schemes of different discharge capacities, and the risk of cascading breaching was also evaluated through CRBS. The results show that, in the dam-break of Tangjiashan barrier lake, the calculated values of the peak outflow rate are about 10% more than the recorded data, which are in an acceptable range. In the simulation of flood routing, the dam-break flood arrived at the downstream reservoir after 3 h. According to the predicted results of flood-regulating calculations and the dam-break simulation in the downstream reservoir, the risk of sequential dam-break can be effectively reduced by setting early warnings to decrease reservoir storage in advance and adding a second discharge tunnel to increase the discharge capacity. Alongside the simulation of flood routing and flood regulation, the whole process of cascade dam-break was completely simulated and the results of CRBS tend to be more reasonable CRBS shows the great value of engineering application in the risk assessment and flood control of cascade reservoirs as an universal numerical prediction model. |
Databáze: | OpenAIRE |
Externí odkaz: |