resultant final failure
Computer science optimisation lcsh:QC501-721 Energy Engineering and Power Technology time-delay concept-based approach Maintenance engineering Scheduling (computing) time-delay interval lcsh:Electricity scheduling Electrical and Electronic Engineering inspection Electronic circuit individual hv cable components accumulate failure numbers maintenance activities associated daily maintenance effort Stochastic process delays defect arrival minimal maintenance cost Statistical model Reliability engineering hv cables high-voltage cable circuits stochastic processes maintenance scheduling delay-time interval lcsh:Electrical engineering. Electronics. Nuclear engineering maintenance engineering lcsh:TK1-9971 defect inception |
Zdroj: | High Voltage (2020) |
DOI: | 10.1049/hve.2020.0024 |
Popis: | The associated daily maintenance effort and cost has been increasing with the growing use of high-voltage (HV) cable circuits. This study proposes a time-delay concept-based approach to maintenance scheduling of individual HV cable components, to allow periodicity of inspection to be optimised with consideration of time-delay interval between the instant of defect inception and final failure. Here, the progress from a defect to its resultant final failure can be represented as a two-stage process, one being a stochastic process of defect arrival and the other being a delay-time interval from defect to failure. Then an optimisation model is established to schedule maintenance activities based on the two statistical processes, where the objective function is set as the minimal maintenance cost. Cable circuits are divided into five components in accordance with the objects of inspection and testing. The components within different service ages are considered individually in the statistical models, and their accumulate failure numbers during each service year are used to automatically formulate and update periodicity of inspection. To illustrate the feasibility of the approach proposed, theoretical analysis on thousands of cable circuits are carried out. Results show that the economic expenditure could be reduced by 22.2% after optimisation. |
Databáze: | OpenAIRE |
Externí odkaz: |