Upgrade of the RBI-AF infrastructure for detector characterisation, SEE, micro hardness testing

Autor: I. Božičević Mihalić, D. D. Cosic, S. Fazinic, M. Jakšić, G. Provatas, M. Vićentijević
Rok vydání: 2023
Předmět:
DOI: 10.5281/zenodo.8026922
Popis: This document is related to the implementation of Task 4.2 ‘Micro-beam upgrade at RBI Accelerator Facility’. The aim is to upgrade the two existing ion micro-beam stations by providing a precise motorized positioning system with the beam current control and device under control position monitor, as well as to demonstrate the sample cooling option for the ‘old’ micro-beam station. It has been planned that up to M23 ‘new’ ion micro-beam station will be upgraded (MS12) and that the ‘old’ micro-beam station will be upgraded in the same way before the project end.