This document is related to the implementation of Task 4.2 ‘Micro-beam upgrade at RBI Accelerator Facility’. The aim is to upgrade the two existing ion micro-beam stations by providing a precise motorized positioning system with the beam current control and device under control position monitor, as well as to demonstrate the sample cooling option for the ‘old’ micro-beam station. It has been planned that up to M23 ‘new’ ion micro-beam station will be upgraded (MS12) and that the ‘old’ micro-beam station will be upgraded in the same way before the project end. |