Electric power grid interconnections in Northeast Asia: A quantitative analysis of opportunities and challenges
Autor: | Takashi Otsuki, Aishah Mohd Isa, Ralph Samuelson |
---|---|
Rok vydání: | 2016 |
Předmět: |
Economic efficiency
Renewable energy Electrical load Computer science Total cost 020209 energy Electricity trade 02 engineering and technology Management Monitoring Policy and Law Electric power system Energy(all) Order (exchange) Environmental protection Linear programming Intermittent energy source 0202 electrical engineering electronic engineering information engineering Energy systems modeling Wind power business.industry Northeast Asia Environmental economics Grid General Energy Electric power transmission Smart grid Electric power Grid interconnections business |
Zdroj: | Energy Policy. 89:311-329 |
ISSN: | 0301-4215 |
DOI: | 10.1016/j.enpol.2015.11.021 |
Popis: | Power grid interconnection has gained attention in Northeast Asia (NEA) as a means to build an economically efficient power system and to effectively utilize renewable energy, such as wind and solar resources in the Gobi Desert and hydro resources in Eastern Russia. In order to quantify the potential economic and environmental benefits from connecting power grids and developing renewables in NEA, we build an NEA-wide multi-region power system model using linear programming techniques. Our analysis considers power system characteristics, such as the seasonal and daily electric load curves of the various NEA economies. Compared to a “no grid extension” scenario, increased access to renewables contributes significantly to emissions reductions and fuel cost savings. However, the results imply modest benefits in lowering total cost because of the large initial investments needed in developing the renewables and the transmission lines. These limited total cost savings are likely to pose an implementation challenge for NEA grid interconnections. Our results also suggest that grid interconnections become more economically attractive in higher fuel price or lower initial cost situations. The relevant planning organizations should carefully consider the initial cost and future fuel price trends when considering how to interconnect power girds in an economical manner. |
Databáze: | OpenAIRE |
Externí odkaz: |