Popis: |
In order to improve the efficiency of gas extraction in coal mines, a data-driven fine-management and control method for gas extraction is proposed. Firstly, the accurate prediction of coal seam thickness and gas content was used to evaluate the gas reserves. Based on the time relationship between mining activities and gas extraction, the calculation model of borehole distance in different extraction units is established, and the differential borehole design is realized. Then, a drilling video-surveillance system and drilling trajectory measurement device are used to control the drilling process and the construction effect. Finally, the model of extraction data-correction and the identification of failed boreholes is established, then the failed boreholes are repaired. The technology method provided in the paper has realized the fine control of gas-extraction borehole design, construction, measurement, and repair, and formed a more scientific gas-extraction borehole control technology system, which provides new thought for efficient gas extraction. |