Validation and Optimization of Activity Estimates of the FiR 1 TRIGA Research Reactor Biological Shield Concrete

Autor: Antti Räty, Merja Tanhua-Tyrkkö, Petri Kotiluoto, Tommi Kekki
Jazyk: angličtina
Rok vydání: 2022
Předmět:
Zdroj: Räty, A, Tanhua-Tyrkkö, M, Kotiluoto, P & Kekki, T 2022, ' Validation and Optimization of Activity Estimates of the FiR 1 TRIGA Research Reactor Biological Shield Concrete ', Nuclear Science and Engineering, vol. 196, no. 6, pp. 735-750 . https://doi.org/10.1080/00295639.2021.2011671
ISSN: 1943-748X
0029-5639
DOI: 10.1080/00295639.2021.2011671
Popis: FiR 1 is a TRIGA Mark II-type research reactor in Finland. It was in operation between 1962 to 2015 and will be dismantled in 2022 to 2023. Preliminary calculations of the activities in the reactor main structures were performed in an earlier stage of the decommissioning project. Samples of the activated parts of the reactor biological shield concrete were drilled in December 2018 to validate these estimates. This paper describes the calculations and gamma activity measurements performed for the activated concrete samples to determine the boundary between radioactive parts and concrete that can plausibly be free-released from regulatory control. The activities have been estimated with a two-step calculation process using the MCNP and ORIGEN-S calculation codes and measurements using an ISOCS gamma spectrometer with a high-purity germanium detector.
Databáze: OpenAIRE