Popis: |
Accurately surveying out the fault, facture zone, water status and other bad geological phenomenon is the key problems for safety and quality in tunnel construction. Based on the different dielectric electrical differences in characteristics, applying geological radar detected the adverse geological in front of the tunnel face and analyzed. The results show the rock in front of tunnel face is broken, the bedding joint is developed, and there is jointed intensive moisture content with the local rich water. In construction process, the support should be strengthened, excavation method should be adjusted) |