Design and Commissioning of the RF System of the Collector Ring at FAIR
Autor: | Laier, Ulrich, Balß, Robert, Blokesch, Guido, Dolinskyy, Oleksiy, Dunkel, Kai, Eisengruber, Matthias, Hottenbacher, Johannes, Hülsmann, Peter, Klingbeil, Harald, Morri, Cristiano, Pretelli, Miguel, Taddia, Giuseppe, Wieschenberg, Frank, Winnefeld, Thomas |
---|---|
Jazyk: | angličtina |
Rok vydání: | 2018 |
Předmět: | |
DOI: | 10.18429/jacow-ipac2018-wepml034 |
Popis: | The Collector Ring (CR), a storage ring intended to perform efficient cooling of secondary beams, is under construction at GSI in the scope of the FAIR project. The RF system of the CR has to provide a frequency range from 1.1 to 1.5 MHz and pulsed gap voltages of up to 200 kVp (0.2 to 1 Hz, max. 10⁻³ duty cycle) and up to 10 kVp in CW operation. Five identical RF stations will be built. Each RF station consists of an inductively loaded cavity, a tetrode based power amplifier, a semiconductor driver amplifier, a switch mode power supply and two digital feedback loops. The main components of the RF station are designed, built and commissioned in close collaboration between GSI and three companies: RI Research Instruments GmbH, Ampegon PPT GmbH and OCEM Energy Technology SRL. In 2016, the first of five RF stations has been integrated at GSI. In 2017 the system was successfully commissioned to demonstrate that all envisaged parameters have been achieved. This contribution will present the requirements imposed the system, the principal design of the overall system as well as of its key components, and the results of the commissioning of the first RF station. Proceedings of the 9th Int. Particle Accelerator Conf., IPAC2018, Vancouver, BC, Canada |
Databáze: | OpenAIRE |
Externí odkaz: |