A critical mass study of Hood No. 5 and the filter boat cleaning and testing hood in the 234-5 Building
Autor: | N. Ketzlach |
---|---|
Rok vydání: | 1955 |
Předmět: | |
Popis: | Calculations are presented for the estimated minimum critical mass of Pu that would be allowed in Hood No. 5 and the filter boat cleaning and testing hood of the Plutonium Finishing Plant. Hood No. 5 contains the overflow tank and two vacuum traps. Limits are given for several pile exposure rates. These limits do not allow the approach of personnel into Hood No. 5 when these vessels are full. |
Databáze: | OpenAIRE |
Externí odkaz: |