Improving project cost estimation by taking into account managerial flexibility
Autor: | Stein W. Wallace, Trond Jørgensen |
---|---|
Rok vydání: | 2000 |
Předmět: |
Information Systems and Management
Actuarial science General Computer Science Cost estimate Basis of estimate Management Science and Operations Research Environmental economics Cost contingency Industrial and Manufacturing Engineering Earned value management Project planning Modeling and Simulation Cost engineering Economics Project portfolio management Project management triangle |
Zdroj: | European Journal of Operational Research. 127:239-251 |
ISSN: | 0377-2217 |
DOI: | 10.1016/s0377-2217(99)00484-1 |
Popis: | Project costs tend to be higher than depicted by budgets. Irrespective of the quality of the project management, this indicates that the budgets are not established in a way which is consistent with how projects are run. Good budgets should on average lead to zero cost overruns. The purpose of this paper is to discuss how project costs (if they are based on models) can be better estimated by taking into account how projects are actually run, in particular, how managerial flexibility adds value to a project. The purpose is not to advocate better ways of running a project, but to obtain better estimates of what projects cost, given the way they are run. |
Databáze: | OpenAIRE |
Externí odkaz: |