An iterative design and schedule approach to the E22 block cave project and production planning at CMOC Northparkes Mines: a case study

Autor: Kris Brown, Sarah Webster, Thomas Bruning, Olinda Garcia, Alexander Campbell
Rok vydání: 2022
Zdroj: Caving 2022: Fifth International Conference on Block and Sublevel Caving.
DOI: 10.36487/acg_repo/2205_20
Databáze: OpenAIRE