Popis: |
172 basic Cessna plane in the process of operation, the production of equipment failure is random, so the evaluation of equipment performance and to predict its failure time to improve the safe operation of the 172 basic plane has important application value. On the plane this complex system, the grey theory combined with 172 basic Cessna plane, the collection of 172 basic aircraft fault information centralized data processing, analysis, prediction model GM (1, 1), through the calculation of the GM model data, and the error precision fitting test, better realize the basic 172 aircraft equipment failure time prediction. |