Hollow Bit: The First Worldwide Campaign Result of a Breakthrough Technology of Slot Recovery Technique in Offshore Abu Dhabi Field

Autor: Kengo Fukuda, Hanifan Mayo Biyanni, Motohiro Toma, Samaawi Moslim Moslim, Takahiro Toki, Ali Yousef Al Zaabi, Abdelrahman Najjar, Omar Chammout
Rok vydání: 2022
Zdroj: Day 2 Tue, November 01, 2022.
DOI: 10.2118/211520-ms
Popis: Demands for reutilizing existing slots on the offshore platform are expected to rise to maintain oil and gas productivity by drilling and completing the well to different targets, whereas most of the slots are occupied in mature fields. Slot recovery operations are one of the solutions to recover occupied slots. Different slot recovery techniques have been executed in the Offshore Abu Dhabi field, which include cut & pull, milling, Casing Pulling Tool, and Conductor Deflector Tool techniques which are time-consuming and require high overpull to release the casings. The hollow bit is a slot recovery technique that enables the user to recover casing by the standard fishing tool (i.e., casing spear and overshot) without excessive overpull which inherits a risk of surface equipment damage and safety issues on the rig floor. Moreover, overcoming the strong cement bonding between a 30" conductor and 13-3/8" casing is difficult and is dependent on the cement condition. The casing is cut into short intervals to be pulled out which results in a long operation duration. Hollow bit removes the annulus cement between 30" conductor pipe and 13-3/8" casing by washing over the cement. Casing cuts can be minimized since the removal of cement from the annulus overcomes the cement condition uncertainties which results in a shorter slot recovery duration. This paper presents the 3 hollow bit field trials conducted in 2021-2022 in Offshore Abu Dhabi. Lessons learned accumulated from each trial were implemented in subsequent wells to improve the performance. Performance was increased by 60% compared to other slot recovery methods by reducing the operation duration from 20.8 days to 12.5 days. Best practices that can be implemented to similar application by hollow bit are also presented.
Databáze: OpenAIRE