The KEK–JAERI joint RNB project

Autor: Y. Arakaki, K. Niki, S. Kanda, E. Tojyo, M. Tomizawa, Mitsuo Koizumi, Toru Nomura, K. Horie, Y. Tsukihashi, Shin-ichi Mitsuoka, Yasuhiro Takeda, Akihiko Osa, Susumu Hanashima, M. H. Tanaka, Katsuhisa Nishio, T. Ishii, A. Iwamoto, Hiroshi Ikezoe, Masao Sataka, K. Tsukada, Hiroari Miyatake, Hidekazu Tayama, S. Arai, T. Yoshida, Yuichiro Nagame, Suehiro Takeuchi, N. Yoshikawa, M. Okada, Shinichi Abe, T. Nakanoya, Ichiro Katayama, N. Ishizaki, Y. Fuchi, Hirokane Kawakami, M. Oyaizu, H. Iimura, M. Matsuda, Hironobu Ishiyama, S. Ichikawa, I. Ohuchi, Masumi Oshima, S. C. Jeong
Rok vydání: 2003
Předmět:
Zdroj: Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms. 204:746-751
ISSN: 0168-583X
Popis: A new ISOL-based radioactive nuclear beam (RNB) facility has been constructed as a joint project of the High Energy Accelerator Research Organization (KEK) and the Japan Atomic Energy Research Institute (JAERI) at the Tandem accelerator of the Tokai site of JAERI. It uses heavy-ion linacs and related equipment of the presently closed KEK-RNB facility. Fission fragments with energy from 0.1 to 8 MeV/u will be available at this facility.
Databáze: OpenAIRE