Method of improving the technology of installing power equipment at hydroelectric stations being reconstructed
Autor: | G. P. Lokhmatikov, A. N. Chusov, A. P. Troitskii |
---|---|
Rok vydání: | 1998 |
Předmět: |
Engineering
Emerging technologies business.industry media_common.quotation_subject Energy Engineering and Power Technology Ocean Engineering Labor intensity Geotechnical Engineering and Engineering Geology Reliability engineering Transport engineering General Energy Installation Hydroelectricity Cost analysis Quality (business) business Reliability (statistics) Power equipment Water Science and Technology media_common |
Zdroj: | Hydrotechnical Construction. 32:651-655 |
ISSN: | 1570-1468 0018-8220 |
DOI: | 10.1007/bf02446344 |
Popis: | 1. The characteristics of reconstructing hydrostations impose individual requirements on the solution of problems of carrying out construction and installation works in the powerhouse. Therefore when developing new technologies and designs main attention is devoted to reducing labor intensity and cost of installation works, shortening installation time, and increasing reliability in the quality of the structural members being installed. 2. On the basis of a functional and cost analysis, the conditions were determined and the method of comparing variants of technological solutions of installing power equipment of hydrostations; the optimal variant precluding the possibility of occurrence of excessive expenses both during reconstruction and operation of the object was selected. |
Databáze: | OpenAIRE |
Externí odkaz: |