Prediction Model of Power Grid Project Duration Based on BP Neural Network
Autor: | Baogang Chen, Jing Mo, Zhanghai He, Qinghe Zeng, Zhilong Weng, Xiangbiao Leng, Haixiang Yu |
---|---|
Rok vydání: | 2022 |
Zdroj: | 2022 4th World Symposium on Artificial Intelligence (WSAI). |
DOI: | 10.1109/wsai55384.2022.9836417 |
Databáze: | OpenAIRE |
Externí odkaz: |