Popis: |
The scope of this paper is to discuss and compare the different milling strategies of the frac plugs associated to hydraulic fracturing operations in both, vertical and horizontal gas wells, with formations depleted in Petroleum Development Oman (PDO); the main objective is to describe milling operations and the well delivery improvement by the optimization of clean out and milling strategy. The paper will show the enhancement of the milling operations and the outstanding results. The paper will start by describing the execution of hydraulic fracturing operations in both vertical and horizontal wells, which is mainly related to plug and perf. It will also cover clean out and milling practices for frac plugs in depleted formations. Further, it will discuss the planning and design of the post frac clean outs and milling jobs based on the learnings previously captured. Frac plugs milling operations have been successfully improved in severe depleted vertical gas wells and some horizontal wells with no severe depletion; initially the milling operation was done after all frac stages were completed in depleted wells, out of the critical path, however the experience showed that it was a lengthy and expensive process due to the severe formation losses while milling leading into a very low efficient operation impacting the frac well delivery. The subsequent step was to address the milling after every stage, during the critical path, which increases the cost of daily frac charges. With the use of an innovate downhole technology the milling strategy was changed and optimized showing outstanding results, milling frac plugs was achieved successfully at the end of the job in horizontal wells while in some previous wells the milling was done in between the stages; also for vertical depleted gas wells, fracturing stages have been combined to mill frac plugs together. The completion of the entire wells (well delivery) was achieved in a relative shorter period of time compared to previous wells; this is reflected on actual cost reduction of more than 20% of total cost/AFE The optimization of the frac plug milling operations is a novel approach to enhance hydraulic fracturing and well delivery in depleted gas wells in PDO, this is in alignment with the continuous improvement (CI) ideas and the lean thinking across the oil and gas industry nowadays. It is easy to replicate in other gas fields expected to be depleted, which will reduce cost, Health, Safety & Environment (HSE) exposure and will help increase the recovery of hydrocarbon reserves. |