Status and Upgrade Plan of the MR Ring RF Systems in J-PARC

Autor: Hasegawa, Katsushi, Hara, Keigo, Nomura, Masahiro, Ohmori, Chihiro, Okita, Hidefumi, Shimada, Taihei, Sugiyama, Yasuyuki, Tamura, Fumihiko, Yamamoto, Masanobu, Yoshii, Masahito
Jazyk: angličtina
Rok vydání: 2022
Předmět:
DOI: 10.18429/jacow-ipac2022-wepotk004
Popis: The J-PARC Main Ring (MR) is a high intensity proton accelerator and delivers 30 GeV proton beams for the long-base line neutrino experiment and the hadron experiments. At present, the beam intensity supplied to the neutrino experiment reached 520 kW with a cycle time of 2.48 s. Toward the design beam power of 750 kW and future goal of 1.3 MW, we chose shortening the MR operation cycle. Accelerating time is shortened in order to shorten the cycle, so a high accelerating voltage is required. Therefore, it is necessary to upgrade the RF systems. This RF upgrade expands the current nine RF systems to a total of thirteen. We are planning to fabricate four RF power sources and add four additional cavities that are recombined with existing cavities. The present status and upgrade plan of the MR RF systems are reported.
Proceedings of the 13th International Particle Accelerator Conference, IPAC2022, Bangkok, Thailand
Databáze: OpenAIRE