Autor: |
Erik Gutenwik, Guilherme Tibau, Maurício Santana, Pierre Jean Pellegri |
Rok vydání: |
1994 |
Předmět: |
|
Zdroj: |
Tunnelling’ 94 ISBN: 9781461361367 |
DOI: |
10.1007/978-1-4615-2646-9_41 |
Popis: |
This paper describes with full details the construction methods of the shafts and penstocks of the Serra da Mesa Power Plant, that is being constructed in Brazil. For the excavation of these structures special equipments have been assembled in the site workshop and proper construction methods have been used to excavate more than 1,000m of shafts without any accident. |
Databáze: |
OpenAIRE |
Externí odkaz: |
|