Popis: |
Due to the shortcomings of conventional methods, the temperature control in rapid construction of Guandi dam is less effective. Then improved measures are designed and implemented based on the dynamic control method of pipe cooling, which depends on the real-time adjustment of five factors affecting pipe cooling (beginning time of cooling, lasting time of cooling, water temperature, rate of flow and direction of flow). The monitoring and feedback calculation are conducted. It is found that the newly-designed measures have obvious effect, and that there are no harmful cracks in the whole construction of Guandi dam. The conclusion is that it can effectively solve the problem of temperature control and crack prevention of high RCC dam via these measures, and provide some guide and reference to other similar projects. |