A Deepwater Openhole Gravel Pack Completion with Prolonged Well Suspension without Initial Cleanup: An Angola Block 15/06 Case History

Autor: Giuseppe Ripa, Daniele Staltari, Balkrishna Gadiyar, J. Urdaneta, Paulo Fernandes, D. Pellicano, O. Barradas, B. A. Magloire, E. P. Sonangol, Y. A. Aye, Mehmet Parlar, L. B. Djouli, A. I. Adeolu, M. M. Nasrallah, Amrendra Kumar, C. Cauende
Rok vydání: 2016
Předmět:
Zdroj: Day 2 Thu, February 25, 2016.
DOI: 10.2118/178933-ms
Popis: Most of the deep water reservoirs in Angola are weakly consolidated sands, requiring sand control, and openhole gravel packing is one of the most widely used sand control techniques in the area, Block 15/06 being no exception. High inclination wells targeting multiple reservoir sections interlayered with reactive shales, relatively low frac window, and prolonged well suspension without well cleanup were some of the challenges that needed to be addressed to ensure completion integrity and well productivity. This paper presents the measures taken during the design and execution phases to address the project challenges, along with an evaluation of completion integrity and well performance. Analysis of the downhole gauge data is detailed for one of the wells as an example, illustrating the importance of including downhole gauges in the completion.
Databáze: OpenAIRE