Integrated scheduling of machines, AGVs and tools in multi-machine FMS using crow search algorithm

Autor: Sivarami Reddy N., V. Ramamurthy D, Prahlada Rao K., Padma Lalitha M.
Rok vydání: 2019
Předmět:
Zdroj: International Journal of Computer Integrated Manufacturing. 32:1117-1133
ISSN: 1362-3052
0951-192X
DOI: 10.1080/0951192x.2019.1686171
Popis: This paper lays down a formal framework for simultaneous scheduling of machines, automated-guided vehicles (AGVs) and tools in a multi-machine flexible manufacturing system (FMS) while acco...
Databáze: OpenAIRE
Nepřihlášeným uživatelům se plný text nezobrazuje