Electrical part of a gas-and-oil condensation power plant with a capacity of 6x200 MW
Jazyk: | ruština |
---|---|
Rok vydání: | 2021 |
Předmět: |
condensing power plants
auxilirales ÑлекÑÑиÑеÑÐºÐ°Ñ ÑаÑÑÑ ÑÑанÑÑоÑмаÑоÑÑ switching devices коммÑÑаÑионнÑе аппаÑаÑÑ transformers self-starting конденÑаÑÐ¸Ð¾Ð½Ð½Ð°Ñ ÑлекÑÑоÑÑанÑÐ¸Ñ ÑобÑÑвеннÑе нÑÐ¶Ð´Ñ electrical part cables ÑамозапÑÑк кабели short circuit currents Ñоки коÑоÑкого замÑÐºÐ°Ð½Ð¸Ñ |
DOI: | 10.18720/spbpu/3/2021/vr/vr21-1891 |
Popis: | ÐÑÐ½Ð¾Ð²Ð½Ð°Ñ ÑÐµÐ»Ñ ÑабоÑÑ: пÑоекÑиÑование ÑлекÑÑиÑеÑкой ÑаÑÑи и ÑобÑÑвеннÑÑ Ð½Ñжд ÐÐС 6Ñ 200 ÐÐÑ. РезÑлÑÑаÑÑ ÑабоÑÑ: 1. ÐÑбÑано оÑновное обоÑÑдование и Ð³Ð»Ð°Ð²Ð½Ð°Ñ ÑÑ ÐµÐ¼Ð° ÑлекÑÑоÑÑанÑии 2. РаÑÑÑиÑÐ°Ð½Ñ Ñоки ÑÑÐµÑ Ñазного коÑоÑкого замÑÐºÐ°Ð½Ð¸Ñ 3. ÐÑбÑÐ°Ð½Ñ ÐºÐ¾Ð¼Ð¼ÑÑаÑионнÑе аппаÑаÑÑ, измеÑиÑелÑнÑе ÑÑанÑÑоÑмаÑоÑÑ, ÑокопÑÐ¾Ð²Ð¾Ð´Ñ 4. ÐÑбÑÐ°Ð½Ñ ÑÑанÑÑоÑмаÑоÑÑ ÑобÑÑвеннÑÑ Ð½Ñжд пеÑвой и вÑоÑой ÑÑÑпени ÑÑанÑÑоÑмаÑоÑÑ, ÑаÑÑÑиÑÐ°Ð½Ñ Ñоки кз на ÑекÑиÑÑ Ñ.н., вÑбÑÐ°Ð½Ñ ÐºÐ°Ð±ÐµÐ»Ð¸ и вÑклÑÑаÑели. 5. ÐÑоизведен ÑаÑÑÐµÑ ÑÑпеÑноÑÑи ÑамозапÑÑка, вÑемени пÑÑка Ñамого моÑного агÑегаÑа, вÑбÑÐ°Ð½Ñ ÑпоÑÐ¾Ð±Ñ ÑегÑлиÑÐ¾Ð²Ð°Ð½Ð¸Ñ Ð¼ÐµÑ Ð°Ð½Ð¸Ð·Ð¼Ð¾Ð² Ñ.н. по заданнÑм ÑÑловиÑм. ÐконÑаÑелÑнÑм ÑезÑлÑÑаÑом ÑабоÑÑ ÑвлÑеÑÑÑ Ð¿ÑÐ¾ÐµÐºÑ ÑлекÑÑиÑеÑкой ÑаÑÑи газомазÑÑной ÐÐС 6*200 ÐÐÑ Ñ ÑеÑÑежами главной ÑÑ ÐµÐ¼Ñ ÑлекÑÑиÑеÑкой ÑаÑÑи и компановки ÑлекÑÑообоÑÑдованиÑ. The main purpose of the work: design of the electrical part and auxiliary needs of the condensation power plant 6x200 MW. Results of work: 1. Selected the main equipment and the main scheme of the power plant 2. Calculated three-phase short-circuit currents 3. Selected switching devices, measuring transformers, current conductors 4. The transformers for auxiliary needs of the first and second stage transformers were selected, the short-circuit currents in the main sections were calculated, the cables and switches were selected. 5. The calculation of the success of the self-start, the start-up time of the most powerful mechanism was made, the ways of regulating the mechanisms of auxiliary needs were selected. according to the specified conditions. The final result of the work is the design of the electrical part of the gas-and-oil condensation power plant 6 * 200 MW with drawings of the main circuit of the electrical part and the layout of electrical equipment. |
Databáze: | OpenAIRE |
Externí odkaz: |