Considerations and observations of stress-induced and construction-induced excavation damage zone in crystalline rock
Autor: | Topias Siren, Pekka Kantia, Mikael Rinne |
---|---|
Rok vydání: | 2015 |
Předmět: | |
Zdroj: | International Journal of Rock Mechanics and Mining Sciences. 73:165-174 |
ISSN: | 1365-1609 |
DOI: | 10.1016/j.ijrmms.2014.11.001 |
Popis: | Bsed on the recent observations from two underground laboratories, the construction-induced excavation damage zone (EDZ CI ) caused by explosion or by mechanical excavation and stress-induced excavation damage zone (EDZ SI ) are distinguished. The key location for in situ testing of EDZ and method development has been the TBM tunnel in Aspo Hard Rock Laboratory in Sweden since the 1990s. The research and development has been continued between 2010 and 2012 with in situ stress measurement campaign and in 2013 with ground penetrating radar investigations with new GPR EDZ method. The new GPR EDZ method based on frequency analysis of the reflected signal indicates mean depth for EDZ CI of 120 mm. The same zone is indicated also by various other geophysical and laboratory methods, and is distinguished as construction-induced and continuous around the tunnel perimeter. Fracture mechanics modelling suggests a lowered hydraulic conductivity of 1.8×10 −13 m/s in EDZ SI and 4.0×10 −11 m/s in EDZ CI . Biaxial testing suggests a zone in which Young’s modulus values are lowered, and which is not continuous around the tunnel. This zone is distinguished as an observable part of stress-induced EDZ SI . |
Databáze: | OpenAIRE |
Externí odkaz: |
načítá se...