Pengaruh Pengalaman Tenaga Kerja terhadap Produktivitas Tenaga Kerja Proyek Konstruksi Gedung Bertingkat di Kota Palu
Autor: | F. Fahirah, N. Nirmala |
---|---|
Rok vydání: | 2023 |
Předmět: | |
Zdroj: | REKONSTRUKSI TADULAKO: Civil Engineering Journal on Research and Development. :67-72 |
ISSN: | 2746-1033 2723-3472 |
DOI: | 10.22487/renstra.v4i1.544 |
Popis: | One measure of the success of high-rise building construction projects is the labor. High labor productivity will support timely completion of projects and more efficient use of costs. Labor productivity will be easily achieved if human resources have previous work experience. The purpose of this study was to determine the effect of labor experience on labor productivity in high-rise building construction projects in the city of Palu. Primary data collection through the distribution of questionnaires, interviews, surveys and documentation. Secondary data is obtained through information on the contractor company. Data analysis using descriptive statistics and multiple linear regression. The results showed that partially the length of time work (X1) and the level of knowledge and skills (X2) had a positive effect on labor productivity (Y) but not significantly. Meanwhile, mastery of work and equipment (X3) partially has a positive and significant effect on labor productivity (Y). Simultaneously the variable length of time/work time (X1), level of knowledge and skills possessed (X2), variable mastery of work and equipment (X3) has a positive and significant effect on labor productivity (Y) with a coefficient of determination (R2) of 88.4%. |
Databáze: | OpenAIRE |
Externí odkaz: |