Minimising maximum tardiness in assembly flowshops with setup times
Autor: | Harun Aydilek, Asiye Aydilek, Ali Allahverdi |
---|---|
Rok vydání: | 2017 |
Předmět: |
0209 industrial biotechnology
Mathematical optimization 021103 operations research Job shop scheduling Computer science Strategy and Management Tardiness 0211 other engineering and technologies Scheduling (production processes) 02 engineering and technology Flow shop scheduling Management Science and Operations Research Industrial and Manufacturing Engineering 020901 industrial engineering & automation Set up time Dominance relation Simulated annealing |
Zdroj: | International Journal of Production Research. 55:7541-7565 |
ISSN: | 1366-588X 0020-7543 |
DOI: | 10.1080/00207543.2017.1387300 |
Popis: | This paper addresses a two-stage assembly flowshop scheduling problem with the objective of minimising maximum tardiness where set-up times are considered as separate from processing times. The per... |
Databáze: | OpenAIRE |
Externí odkaz: | |
Nepřihlášeným uživatelům se plný text nezobrazuje | K zobrazení výsledku je třeba se přihlásit. |