Salt River Project, Coronado Station: Mitigation Plans for Seven Impacted Bureau of Land Management Properties - NA14,638; NA14,640; NA14,642; NA14,650; NA15,208; NA13,911; NA14,869
Autor: | Marmaduke, William S. |
---|---|
Jazyk: | angličtina |
Rok vydání: | 2017 |
Předmět: |
Site Evaluation / Testing
Coal Haul Spur Railroad Chipped Stone Basketmaker II to III Pueblo II NA13 911 Arizona (State / Territory) Ceramic SRP Mitigation Planning Research Design / Data Recovery Plan NA15 208 Salt River Project Coronado-Silver King Transmission Line Coronado Generating Station NA14 650 NA14 640 NA14 642 Coronado Station Pueblo I-III NA14 638 NA14 869 |
DOI: | 10.6067/xcv8433667 |
Popis: | Responding to a request from the Bureau of Land Management (BLM), Phoenix District, the Museum of Northern Arizona has prepared a description of work that the Museum will undertake at sites on BLM managed lands during the Coronado Station Archaeological Project. The total number of BLM sites impacted by Coronado Station construction is seven: five sites (NA's 14,638; 14,640; 14,642; 14,650; 15,208) in right-of-way of the Coal Haul Railroad, and two sites (NA13,911 and NA14,869) in the right-of-way of the Coronado-Silver King-Cholla Transmission System. Mitigation studies at all sites adhere to the goals of the Coronado Project generally. A statement of these goals exists in the Coronado Project Research Design, a document that should be transmitted to BLM along with the present work. |
Databáze: | OpenAIRE |
Externí odkaz: |