A Study on the Estimation of the Number of Working Days for Harbor Construction Project Considering Wave Condition
Autor: | Weon-Mu Jeong, Hyukjin Choi, Jong-Dai Back, Se-Ho Choi |
---|---|
Rok vydání: | 2019 |
Předmět: | |
Zdroj: | Korea Society of Coastal Disaster Prevention. 6:71-82 |
ISSN: | 2288-8020 2288-7903 |
DOI: | 10.20481/kscdp.2019.6.2.71 |
Databáze: | OpenAIRE |
Externí odkaz: |