PENGENDALIAN PELAKSANAAN PROYEK DITINJAU DARI SEGI WAKTU PADA GEDUNG RRC DI PROYEK REKONTRUKSI DAN PENINGKATAN UNP

Autor: Rosi Maida Astuti, Nasrul Nasrul
Rok vydání: 2020
Předmět:
Zdroj: Rang Teknik Journal. 3:362-365
ISSN: 2599-2090
2599-2082
DOI: 10.31869/rtj.v3i2.1938
Popis: To monitor and control the timing of the project needs to use one method that meets these goals is a network (network planning) concept of the value of the results ( earned value concept) in the form of a schedule of integrated (schedule variance ), which consists of three indicators , namely BCWS , BCWP , and ACWP , Research procedure begins with a feasibility study case , collecting data , and analyzing the results from the available data.