System maintenance verification and validation plan for the TWRS controlled baseline database system
Autor: | S.G. Spencer |
---|---|
Rok vydání: | 1998 |
Předmět: | |
DOI: | 10.2172/362421 |
Popis: | TWRS Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the verification and validation approach for system documentation changes within the database system. |
Databáze: | OpenAIRE |
Externí odkaz: |