BIM-based 4D mobile crane simulation and onsite operation management
Autor: | Ali Mousaei, Hosein Taghaddos, Anahita Bolourani, Ala Nekouvaght Tak, Ulrich Hermann |
---|---|
Rok vydání: | 2021 |
Předmět: |
Computer science
Lift (data mining) 0211 other engineering and technologies 020101 civil engineering 02 engineering and technology Building and Construction Animation 0201 civil engineering Scheduling (computing) Control and Systems Engineering 021105 building & construction Modular programming Operations management Mobile crane Macro Civil and Structural Engineering Safety monitoring |
Zdroj: | Automation in Construction. 128:103766 |
ISSN: | 0926-5805 |
DOI: | 10.1016/j.autcon.2021.103766 |
Popis: | Heavy industrial construction, particularly when modularization is adopted, requires thorough heavy-lift studies to manage the extensive use of mobile cranes in congested and dynamic site layouts. This study introduces an integrated 4D crane simulation and onsite operation management framework for multiple concurrent mobile crane operations in the BIM environment with the support of a comprehensive database. Unlike similar recent efforts, the proposed framework is built upon previously developed crane planning and optimization systems, which enables generating accurate operation plans both in micro (objects) and macro scales (site). This framework addresses five different components regarding onsite crane operation management, including BIM-based multi-crane lift animation, scheduling and cost analyses, motion controlling in the BIM environment, safety monitoring and clash detection, and spatiotemporal site analyses. The developed framework's functionality is validated by implementing it into a portion of a real project in Alberta, Canada, through three different cases. |
Databáze: | OpenAIRE |
Externí odkaz: |