Autor: | Takeshi Kawaguchi, Yoshinori Oono, Takeo Asanuma, Michio Gomyo, Kenji Hirata |
---|---|
Rok vydání: | 2004 |
Předmět: | |
Zdroj: | PROCEEDINGS OF CIVIL ENGINEERING IN THE OCEAN. 20:935-940 |
ISSN: | 1884-8265 0912-7348 |
DOI: | 10.2208/prooe.20.935 |
Popis: | This paper is intended as an investigation on management system for constructing artificial mound with lots of blocks in a deepwater area. A system is developed by integrating some technologies noticing on measurement of position and vertical current profile, prediction of blocks dispersion, decision of dumping point, method of dumping blocks from the barge, monitoring settling blocks and measurement of created mound figuration. It was applied to the works executed at the depth of 85m off the Uku Island where complicated flow due to Tsushima Current is observed from the surface to the sea bottom.It is found that the distance between median point of accumulated mound and objective point was a few meters and acceptable conical mound was created successfully. |
Databáze: | OpenAIRE |
Externí odkaz: |