Project Planning and Control by Time-Sharing Computer

Autor: Norman L. Scott, E. Lile Murphree
Rok vydání: 1972
Předmět:
Zdroj: Journal of the Construction Division. 98:37-48
ISSN: 2690-2400
0569-7948
DOI: 10.1061/jcceaz.0000336
Popis: CPM has been a successful construction management tool only when the networks have been updated on a timely basis. Direct interaction with a computer by a teletype-telephone line link has proved to be an economical means of maintaining currency of the network. Essential features of time-sharing a computer for CPM calculations are analyzed. An example of the use of a typical time-share CPM system featuring a Problem-Oriented Language is given.
Databáze: OpenAIRE