The PBMR steady-state and coupled kinetics core thermal-hydraulics benchmark test problems
Autor: | Frederik Reitsma, D. F. Da Cruz, Hans D. Gougar, Kostadin Ivanov, J. B. M. De Haas, Bismark Tyobeka, U.E. Sikik, Ramatsemela Mphahlele, Gerhard Strydom, V. Seker, Thomas J. Downar |
---|---|
Rok vydání: | 2006 |
Předmět: |
Nuclear and High Energy Physics
Engineering Pebble-bed reactor business.industry Mechanical Engineering Reference design Modular design Industrial engineering Thermal hydraulics Test case Nuclear Energy and Engineering Nuclear reactor core Benchmark (computing) General Materials Science Safety Risk Reliability and Quality business Waste Management and Disposal Simulation Verification and validation |
Zdroj: | Nuclear Engineering and Design. 236:657-668 |
ISSN: | 0029-5493 |
DOI: | 10.1016/j.nucengdes.2005.12.007 |
Popis: | In support of the pebble bed modular reactor (PBMR) Verification and Validation (V&V) effort, a set of benchmark test problems has been defined that focus on coupled core neutronics and thermal-hydraulic code-to-code comparisons. The motivation is not only to test the existing methods or codes available for high-temperature gas-cooled reactors (HTGRs), but also to serve as a basis for the development of more accurate and efficient tools to analyse the neutronics and thermal-hydraulic behaviour for design and safety evaluations in future. The reference design for the PBMR268 benchmark problem is derived from the 268 MW PBMR design with a dynamic central column containing only graphite spheres. Several simplifications were made to the design in order to limit the need for any further approximations when defining code models. During this process, care was taken to ensure that all the important characteristics of the reactor design were preserved. The definition and initial phases of the benchmark were performed under a cooperative research project between NRG, Penn State University (PSU) and PBMR (Pty) Ltd. However, participation has been extended to include Purdue University and INL. All contributions to the benchmark effort were made in-kind by the participating members including the participation in four benchmark meetings over a period of 3 years. Based on the work performed in this benchmark the PBMR 400 MW design with fixed central reflector has been accepted as an OECD benchmark problem and work has already started. In this paper, the benchmark definition and the different test cases are described in some detail. Phase 1 focuses on steady-state conditions with the purpose of quantifying differences between code systems, models and basic data. It also serves as the basis to establish a common starting condition for the transient cases. In Phase 2, the focus is on performing coupled kinetics/core thermal-hydraulics test problems with a common cross-section and material property sets. The six events selected are described, and examples of some results are included to illustrate the behaviour of the transients. The final results of this work will be published in an NRG report and the focus will move to the OECD 400 MW benchmark problem. |