Master production schedule time interval strategies in make-to-order supply chains¶
Autor: | Funda Sahin, Li-Lian Gao, E. Powell Robinson |
---|---|
Rok vydání: | 2008 |
Předmět: |
Engineering
Material requirements planning Operations research Vendor business.industry Build to order Strategy and Management Supply chain Time horizon Management Science and Operations Research Industrial and Manufacturing Engineering Cost reduction Master production schedule Build to stock business |
Zdroj: | International Journal of Production Research. 46:1933-1954 |
ISSN: | 1366-588X 0020-7543 |
Popis: | While the literature primarily addresses MPS design from the manufacturer's perspective, this research considers MPS policy design in a two-stage rolling schedule environment with a particular focus on the policy governing schedule flexibility in the non-frozen time interval (i.e. liquid versus slushy orders). Using computer simulation, we experimentally evaluate the impact of four MPS design factors (non-frozen interval policy, planning horizon length, frozen interval length and re-planning frequency) and four environmental factors (natural order cycle length, vendor flexibility, demand range and demand lumpiness) on MPS schedule cost and instability. The experimental design considers the often-conflicting impact of MPS policy on the channel members by capturing performance metrics at the manufacturer, vendor and system level. The research findings indicate that moving from a liquid to a slushy non-interval strategy increases the manufacturer's costs, but may result in an even greater cost reduction for ... |
Databáze: | OpenAIRE |
Externí odkaz: | |
Nepřihlášeným uživatelům se plný text nezobrazuje | K zobrazení výsledku je třeba se přihlásit. |