Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine
Autor: | A. G. Anisimov, A. R. Gevorgyan, S. Kh. Eritsyan, G. S. Petrosyan, M. V. Klub, A. V. Avtandilyan, K. B. Sargsyan |
---|---|
Rok vydání: | 2016 |
Předmět: |
Gas turbines
Engineering Combined cycle business.industry 020209 energy Nuclear engineering Shutdown Boiler (power generation) Energy Engineering and Power Technology 02 engineering and technology Steam-electric power station Turbine Automotive engineering law.invention Electric discharge in gases law Heat recovery steam generator 0202 electrical engineering electronic engineering information engineering business |
Zdroj: | Power Technology and Engineering. 49:359-364 |
ISSN: | 1570-1468 1570-145X |
DOI: | 10.1007/s10749-016-0628-4 |
Popis: | The principles of starting up the steam power unit of the Hrazdan-5 fully fired combined-cycle power unit (Hrazdan, Armenia) are considered. This plant has neither a bypass stack for gas discharge from the gas turbine nor an external steam source for the steam-turbine gland and prestarting deaeration. Emphasis is placed on the differences between the start-up procedure followed at the plant and the procedure provided by the RD 34.25.512 Standard Instructions on Startup from Various Thermal States and Shutdown of 300-MW Boiler-Turbine Sets with K-300-240 LMZ Turbine. |